Weekly report : from January 19 through January 25, 2000

1/28/2000
Press release

At the UP2 plant, shearing of fuel assemblies from a batch of EDF 900 MWe fuel continued in the R1 head-end facility. A total of 41 metric tons of uranium have been processed to date this year.

At the R7 vitrification facility, two lines are in operation. A total of 7 canisters of glass have been produced to date this year.

At the UP3 plant, all facilities are shut down.

At the T7 vitrification facility, one line is in service. A total of 10 canisters of glass have been produced to date this year.


Work in the Moulinets Cove

Work continues on modifications to the discharge pipe in the tidal basin:

  • radiological monitoring of sediments has revealed no anomalies, although there are fluctuations close to the old discharge pipe;
  • excavation at the nose of the incline was completed using a “spider” shovel during very low tides occurring over the week-end;
  • sections of steel pipe sleeving were submersed, positioned and attached to base plates anchored in the backfilling.